Uploaded image for project: 'FullCalendar Macro'
  1. FullCalendar Macro
  2. FULLCAL-79

Event times shift since v2.4.0

    XMLWordPrintable

Details

    • Bug
    • Resolution: Fixed
    • Blocker
    • 2.4.3
    • 2.4.2
    • Unknown

    Description

      Prerequisites:

      • XWiki 14.10.20
      • latest version of FullCalendar (for reporting time v2.4.2)
      • calendar with events

      Steps to reproduce:

      1. import calendar into XWiki page via syntax 
        {{calendar iCal=" URLtoICS"/}} 
      1. save the page

      Actual result

      The event from calendar will be shifted for 1 hour (start and end time) while in Google Calendar those events will have correct start and end time.

      Expected result

      The event from calendar has same layout as in Google Calendar

       Note

      I labeled this issue as blocker, because I'm not reproducing it if I downgrade to version 2.3.2, the bug arises since v2.4.0.

      Attachments

        Activity

          People

            Sorin Sorin Chiuchiu
            npetrenko Nikita Petrenko
            Votes:
            0 Vote for this issue
            Watchers:
            0 Start watching this issue

            Dates

              Created:
              Updated:
              Resolved: